Highway Drainage
DRAINAGE AND HYDROLOGY

Highway 7 Fowlers Corners to Highway 115

As part of the Preliminary Design Report, conducted the drainage and hydrology studies and storm water management design to accommodate the improvements required in the 20-year project horizon and the long-term improvements to the highway.

 

Highway 404, Major Mackenzie Drive to Bloomington Road – Greer Galloway Group

Design of the drainage and stormwater quantity and quality management system for the Highway 404 corridor between Major Mackenzie Drive and Bloomington Road, for the Ontario Ministry of Transportation.